Evacuation planning is a central part of building fire safety. People need clear and accessible routes to reach a safe location when an emergency occurs. The revised SBC 201 provisions include changes that affect occupant load calculations, atrium stairs and certain mechanical rooms. These updates should be reviewed carefully during the design of new buildings and relevant alterations.

The 2024 editions of SBC 201 and SBC 801 became effective on 1 July 2025. Their requirements influence how project teams assess building layouts, emergency routes and fire protection arrangements.

An effective evacuation strategy begins with understanding who uses the building, how spaces are occupied and where people are likely to move during an emergency. Designers should consider normal operations as well as unusual situations, including reduced visibility, alarm activation and blocked routes.

2. Understanding Occupant Load Calculations

Occupant load calculations help determine the number of people a building or space is expected to accommodate. They are important because exit capacity and other egress provisions depend on the calculated population.

The revised Table 1004.5 changes the business occupancy occupant load factor from 9 square metres per person to 14 square metres per person. This change may affect calculations for relevant business spaces.

Designers should identify the occupancy classification and use the applicable factor. They should then review the calculated occupant load against exit arrangements, corridor widths and stair capacity.

A careful calculation process should include:

  • Confirming the intended use of each space.

  • Identifying the correct occupancy classification.

  • Applying the relevant occupant load factor.

  • Reviewing the number and distribution of exits.

  • Checking travel distances and common paths.

  • Coordinating occupant numbers with building operations.

The team should keep clear records of its assumptions and calculations. If the building use changes later, the occupant load and evacuation strategy may need to be reviewed again.

3. Designing Safe Exit Routes

An exit route should provide a clear and reliable path from an occupied space towards a safe location. Its design involves more than choosing the nearest door. Designers must consider exit capacity, travel distance, door operation, corridor arrangements and the protection of escape routes.

Protected stairs are particularly important in multi-storey buildings. Their position and capacity should support the building's expected occupant load. Corridors and exit access paths should remain free from obstructions and should not be used as storage areas.

Emergency signs and lighting help occupants identify routes when normal building conditions are disrupted. These elements should be coordinated with the architectural layout and relevant fire safety systems.

Designers should also consider the needs of people who may require assistance during evacuation. The building's emergency arrangements should be practical and consistent with applicable accessibility and life safety requirements.

A reliable strategy should be supported by clear drawings and documentation. These should show exit locations, route connections and relevant assumptions used during the design process.

4. Atrium Stairs and Alternative Egress Arrangements

Atriums can create open and visually connected spaces within commercial, residential and public buildings. However, they also require careful consideration because open vertical spaces may influence smoke movement and evacuation.

The revised provisions allow an open stairway within an atrium to be considered a means of egress when the requirements in Chapter 4, Section 404.10 are satisfied.

This provision should be applied according to the actual building design. An open stairway does not automatically qualify as a compliant exit simply because it connects different floors. The relevant conditions must be checked and documented.

Project teams should review the relationship between the atrium, surrounding occupied areas, exit routes and smoke management strategy. The design should demonstrate that the proposed arrangement meets the applicable requirements.

Architectural changes can affect these relationships. For example, adding a new floor opening or changing the atrium boundary may influence the original fire strategy. Design reviews should therefore take place whenever major layout changes are proposed.

5. Special Considerations for Mechanical Rooms

Mechanical rooms support building operations but may have different occupancy patterns from offices, shops or residential spaces. The revised code provides an exemption from common path of egress travel limitations for unoccupied mechanical rooms that are accessed only occasionally for maintenance.

The exemption should be applied only when the room meets the stated conditions. Designers should not use it as a general reason to ignore safe access or maintenance arrangements.

A maintenance room should have suitable access for authorised personnel. Equipment layout, service clearances, lighting and safe working conditions should be considered during planning.

The distinction between a regularly occupied space and an occasionally accessed technical room should be clear in the project documentation. If the room's use changes, the team should reassess the applicable requirements.

These considerations help ensure that code provisions are applied according to the actual function of each space.

6. Conclusion

Good evacuation design combines accurate occupant load calculations, suitable exit arrangements and careful coordination of building features. The revised Saudi provisions should be reviewed alongside the building's occupancy, layout and emergency systems. Clear documentation helps demonstrate compliance and supports future inspections and building management.

Complex projects may also require specialist fire engineering analysis. Fire and Smoke CFD Consulting should be considered only where the project has a defined need for computational fire or smoke analysis. The supplied Vortex Fire page focuses on mass timber building compliance, alternative solutions and fire resistance calculations rather than describing a dedicated CFD service. Its content is relevant to timber construction, while any Fire and Smoke CFD Consulting scope should be confirmed separately.

FAQs

What is an occupant load?

It is the calculated number of people expected to use a building or particular space under the applicable code requirements.

What changed for business occupancy?

The revised Table 1004.5 factor changed from 9 square metres per person to 14 square metres per person.

Can an open atrium stair count as an exit?

It may qualify when the requirements of Chapter 4, Section 404.10 are satisfied.

Are all mechanical rooms exempt from common path limitations?

No. The exemption applies to qualifying unoccupied rooms that are accessed only occasionally for maintenance.

Why should evacuation routes be reviewed early?

Early review helps identify problems with exit capacity, travel distances, layout coordination and accessibility before construction begins.