Most solar permit delays have nothing to do with the system itself. The panels are fine, the inverter is right and the customer is ready. The delay comes from a drawing set that reaches the building department without the engineering sign-off it needed, or with a stamp that doesn't match the drawings underneath it. Fixing that after submission costs days that no installer can bill for....