Solar Design Stamping Services: A Smarter Path to Permit Approval
  Most solar permit delays have nothing to do with the system itself. The panels are fine, the inverter is right and the customer is ready. The delay comes from a drawing set that reaches the building department without the engineering sign-off it needed, or with a stamp that doesn't match the drawings underneath it. Fixing that after submission costs days that no installer can bill for....